12712 Train Running StatusPinakini Express

12712

12712 Pinakini Express route and time table

Scheduled arrival and departure at every halt, with the distance covered from Chennai Central. Times are as per the Indian Railways timetable — for today's actual running position, check the live running status for train 12712.

Station-by-station time table for train 12712 Pinakini Express from Chennai Central to Vijayawada Jn
#StationArrivesDepartsHaltDayDistance
1Chennai Central (MAS)Source14:0510 km
2Sullurupeta (SPE)15:1815:202 min183 km
3Nayadupeta (NYP)15:4315:452 min1110 km
4Gudur Jn (GDR)16:1316:152 min1138 km
5Nellore (NLR)16:4816:502 min1176 km
6Bitragunta (BTTR)17:1817:202 min1210 km
7Kavali (KVZ)17:3917:401 min1227 km
8Singarayakonda (SKM)18:1318:152 min1264 km
9Ongole (OGL)18:4318:452 min1292 km
10Chirala (CLX)19:2419:251 min1342 km
11Bapatla (BPP)19:3919:401 min1357 km
12Nidubrolu (NDO)19:5820:002 min1377 km
13Tenali Jn (TEL)20:1820:202 min1399 km
14Vijayawada Jn (BZA)21:35Destination1431 km

About train 12712

Train number 12712 is the Pinakini Express, run by Indian Railways between Chennai Central and Vijayawada Jn, covering 431 km in about 7 hours 30 minutes with 14 scheduled halts. It runs every day of the week. A pantry car is attached, so meals are served on board.

The train leaves Chennai Central at 14:05 and is scheduled to reach Vijayawada Jn at 21:35 the same day. The whole journey is completed on the same calendar day.

Running status on this page is the live position reported for the train — which station it has passed, how many minutes it is behind schedule, and when it is now expected at each remaining halt. Delays build and shrink through a journey, so a train that is late early on can still recover time before it reaches you.

Frequently asked questions about train 12712

Where does train 12712 start and end?
12712 Pinakini Express starts from Chennai Central (MAS) and ends at Vijayawada Jn (BZA). The full run is 431 km.
What time does train 12712 depart?
Train 12712 Pinakini Express is scheduled out of Chennai Central at 14:05, reaching Vijayawada Jn at 21:35 the same day. Actual departure can differ on the day, so check the live running status before you leave for the station.
How many stops does 12712 have?
Train 12712 has 14 scheduled halts between Chennai Central and Vijayawada Jn, each listed with its arrival time, departure time and halt length. Stations the train passes without stopping are not counted.
Does train 12712 run daily?
Yes — train 12712 runs every day of the week.
How late is train 12712 running right now?
The live running status for train 12712shows its current delay in minutes along with the last station crossed. It is refreshed from the railways' own feed, so it reflects the position reported for the train at the moment the page is loaded.

Other trains from Chennai Central and Vijayawada Jn

TrainRunningStatus.live is an independent service and is not affiliated with, endorsed by, or operated by Indian Railways or IRCTC. Timetable and running information is provided for guidance; always confirm critical timings with the railways.