12880 Train Running StatusBhubaneswar - Mumbai LTT SF Express

12880

12880 Bhubaneswar - Mumbai LTT SF Express route and time table

Scheduled arrival and departure at every halt, with the distance covered from Bhubaneswar. Times are as per the Indian Railways timetable — for today's actual running position, check the live running status for train 12880.

Station-by-station time table for train 12880 Bhubaneswar - Mumbai LTT SF Express from Bhubaneswar to Lokmanya Tilak Term
#StationArrivesDepartsHaltDayDistance
1Bhubaneswar (BBS)Source07:2010 km
2Cuttack (CTC)07:5007:559 min128 km
3Dhenkanal (DNKL)08:4508:472 min184 km
4Talcher Road (TLHD)09:3009:322 min1133 km
5Angul (ANGL)09:5509:572 min1145 km
6Sambalpur (SBP)12:1512:3512 min1301 km
7Jharsuguda Road (JSGR)13:3013:355 min1348 km
8Belpahar (BPH)14:1314:152 min1368 km
9Raigarh (RIG)14:5314:552 min1419 km
10Champa (CPH)15:5015:522 min1498 km
11Bilaspur Jn (BSP)16:5017:0515 min1551 km
12Raipur Jn (R)18:3518:405 min1662 km
13Gondia Jn (G)21:1821:202 min1834 km
14Nagpur (NGP)00:0000:055 min2964 km
15Akola Jn (AK)03:3203:353 min21,217 km
16Bhusaval Jn (BSL)05:3505:405 min21,356 km
17Manmad Jn (MMR)08:1008:122 min21,540 km
18Nasik Road (NK)09:1009:155 min21,613 km
19Kalyan Jn (KYN)11:5211:553 min21,747 km
20Thane (TNA)12:1712:203 min21,767 km
21Lokmanya Tilak Term (LTT)13:00Destination21,785 km

About train 12880

Train number 12880 is the Bhubaneswar - Mumbai LTT SF Express, run by Indian Railways between Bhubaneswar and Lokmanya Tilak Term, covering 1,785 km in about 29 hours 40 minutes with 21 scheduled halts. It runs on Monday and Thursday. A pantry car is attached, so meals are served on board.

The train leaves Bhubaneswar at 07:20 and is scheduled to reach Lokmanya Tilak Term at 13:00 on day 2. Because the journey runs past midnight, remember that the arrival date is the next day than the date you boarded — the day column in the timetable shows this for every halt.

Running status on this page is the live position reported for the train — which station it has passed, how many minutes it is behind schedule, and when it is now expected at each remaining halt. Delays build and shrink through a journey, so a train that is late early on can still recover time before it reaches you.

Frequently asked questions about train 12880

Where does train 12880 start and end?
12880 Bhubaneswar - Mumbai LTT SF Express starts from Bhubaneswar (BBS) and ends at Lokmanya Tilak Term (LTT). The full run is 1,785 km.
What time does train 12880 depart?
Train 12880 Bhubaneswar - Mumbai LTT SF Express is scheduled out of Bhubaneswar at 07:20, reaching Lokmanya Tilak Term at 13:00 on day 2. Actual departure can differ on the day, so check the live running status before you leave for the station.
How many stops does 12880 have?
Train 12880 has 21 scheduled halts between Bhubaneswar and Lokmanya Tilak Term, each listed with its arrival time, departure time and halt length. Stations the train passes without stopping are not counted.
Does train 12880 run daily?
No — train 12880 runs on Monday and Thursday.
How late is train 12880 running right now?
The live running status for train 12880shows its current delay in minutes along with the last station crossed. It is refreshed from the railways' own feed, so it reflects the position reported for the train at the moment the page is loaded.

Other trains from Bhubaneswar and Lokmanya Tilak Term

TrainRunningStatus.live is an independent service and is not affiliated with, endorsed by, or operated by Indian Railways or IRCTC. Timetable and running information is provided for guidance; always confirm critical timings with the railways.