53611 Train Running StatusBarwadih Dehri on Sone Passenger

53611

53611 Barwadih Dehri on Sone Passenger route and time table

Scheduled arrival and departure at every halt, with the distance covered from Barwadih Jn. Times are as per the Indian Railways timetable — for today's actual running position, check the live running status for train 53611.

Station-by-station time table for train 53611 Barwadih Dehri on Sone Passenger from Barwadih Jn to Dehri On Sone
#StationArrivesDepartsHaltDayDistance
1Barwadih Jn (BRWD)Source05:0010 km
2Mangra (MAZ)05:1105:121 min16 km
3Keckhi (KCKI)05:2305:241 min113 km
4Chianki (CNF)05:3505:361 min120 km
5Daltonganj (DTO)05:4805:502 min127 km
6Kajri (KFT)06:0106:021 min134 km
7Rajhura (RHR)06:1506:161 min145 km
8Lalgarh Bihar Halt (LBT)06:2506:261 min149 km
9Tolra (TRZ)06:3706:381 min155 km
10Garwa Road (GHD)07:1007:155 min161 km
11Sigsigi (SQS)07:2107:221 min167 km
12Karkata (KRTA)07:2907:301 min171 km
13Untare Road (URD)07:3807:391 min177 km
14Satbahini (SZF)07:4507:461 min182 km
15Muhammadganj (MDJ)07:5407:551 min189 km
16Kosiara (KVQ)08:0308:041 min195 km
17Haidarnagar (HDN)08:1208:131 min1101 km
18Japla (JPL)08:2608:271 min1108 km
19Kajrat Nawadih (KYF)08:3308:341 min1115 km
20Nabenagar Road (NBG)08:4308:441 min1124 km
21Barkisalalya (BSYA)08:5208:531 min1132 km
22Ankorah Akorha (ANH)09:0109:021 min1138 km
23Bagahabishunpur (BCJ)09:1109:121 min1146 km
24Son Nagar (SEB)09:28Destination1154 km

About train 53611

Train number 53611 is the Barwadih Dehri on Sone Passenger, run by Indian Railways between Barwadih Jn and Dehri On Sone, covering 160 km in about 5 hours 45 minutes with 24 scheduled halts. It runs every day of the week.

The train leaves Barwadih Jn at 05:00 and is scheduled to reach Dehri On Sone at 09:28 the same day. The whole journey is completed on the same calendar day.

Running status on this page is the live position reported for the train — which station it has passed, how many minutes it is behind schedule, and when it is now expected at each remaining halt. Delays build and shrink through a journey, so a train that is late early on can still recover time before it reaches you.

Frequently asked questions about train 53611

Where does train 53611 start and end?
53611 Barwadih Dehri on Sone Passenger starts from Barwadih Jn (BRWD) and ends at Dehri On Sone (SEB). The full run is 160 km.
What time does train 53611 depart?
Train 53611 Barwadih Dehri on Sone Passenger is scheduled out of Barwadih Jn at 05:00, reaching Dehri On Sone at 09:28 the same day. Actual departure can differ on the day, so check the live running status before you leave for the station.
How many stops does 53611 have?
Train 53611 has 24 scheduled halts between Barwadih Jn and Dehri On Sone, each listed with its arrival time, departure time and halt length. Stations the train passes without stopping are not counted.
Does train 53611 run daily?
Yes — train 53611 runs every day of the week.
How late is train 53611 running right now?
The live running status for train 53611shows its current delay in minutes along with the last station crossed. It is refreshed from the railways' own feed, so it reflects the position reported for the train at the moment the page is loaded.

Other trains from Barwadih Jn and Dehri On Sone

TrainRunningStatus.live is an independent service and is not affiliated with, endorsed by, or operated by Indian Railways or IRCTC. Timetable and running information is provided for guidance; always confirm critical timings with the railways.