54781 Train Running StatusBhatinda - Rewari Passenger

54781

54781 Bhatinda - Rewari Passenger route and time table

Scheduled arrival and departure at every halt, with the distance covered from Bathinda Jn. Times are as per the Indian Railways timetable — for today's actual running position, check the live running status for train 54781.

Station-by-station time table for train 54781 Bhatinda - Rewari Passenger from Bathinda Jn to Rewari
#StationArrivesDepartsHaltDayDistance
1Bhatinda Jn (BTI)Source17:3010 km
2Gahri Bhagi (GHB)17:4417:451 min115 km
3Shergarh (SGA)17:5117:5323 min116 km
4Manwala Kot Bakhtu (MKBH)17:5918:001 min119 km
5Bangi Nihal Singh (BNLS)18:0518:061 min123 km
6Raman (RMN)18:1118:1324 min128 km
7Ratangarh Kanakwal (RKK)18:2018:222 min135 km
8Kalanwali (KNL)18:3118:332 min142 km
9Sukhchain (SCV)18:4318:441 min151 km
10Bara Gudah (BGD)18:5118:532 min158 km
11Sirsa (SSA)19:1019:155 min176 km
12Bajekan (BJKN)19:2219:231 min182 km
13Suchan Kotli (SHN)19:3119:332 min191 km
14Jodhka (JOK)19:4019:411 min195 km
15Ding (DING)19:4719:492 min1100 km
16Mehuwala Halt (MHUL)19:5819:591 min1107 km
17Bhattu (BHT)20:0420:0620 min1112 km
18Khabra Kalan (KBKN)20:1420:151 min1118 km
20Jakhod Khera (JKHI)20:3820:402 min1142 km
21Nyoli Kalan (NKN)20:4820:491 min1148 km
22Hisar (HSR)21:2521:3510 min1158 km
23Satrod (STD)21:4521:472 min1168 km
24Mayar (MAYR)21:5421:551 min1172 km
25Hansi (HNS)22:0322:052 min1181 km
26Aurang Nagar (AUN)22:1422:151 min1188 km
27Jitakheri (JKZ)22:2022:211 min1190 km
28Bawani Khera (BWK)22:3122:321 min1200 km
29Sui (SUI)22:4222:431 min1209 km
30Bhiwani (BNW)22:5523:005 min1218 km
31Manheru (MHU)23:1123:132 min1231 km
32Charkhi Dadri (CKD)23:2523:272 min1245 km
33Jharili (JRL)23:4123:432 min1259 km
34Sudharana (SDRA)23:5223:542 min1267 km
35Kosli (KSI)00:0100:032 min2273 km
36Jatusana (JTS)00:1300:152 min2283 km
37Kishangarh Balawas (KGBS)00:2400:262 min2292 km
38Rewari (RE)01:15Destination2300 km

About train 54781

Train number 54781 is the Bhatinda - Rewari Passenger, run by Indian Railways between Bathinda Jn and Rewari, covering 300 km in about 7 hours 45 minutes with 37 scheduled halts. It runs every day of the week.

The train leaves Bathinda Jn at 17:30 and is scheduled to reach Rewari at 01:15 on day 2. Because the journey runs past midnight, remember that the arrival date is the next day than the date you boarded — the day column in the timetable shows this for every halt.

Running status on this page is the live position reported for the train — which station it has passed, how many minutes it is behind schedule, and when it is now expected at each remaining halt. Delays build and shrink through a journey, so a train that is late early on can still recover time before it reaches you.

Frequently asked questions about train 54781

Where does train 54781 start and end?
54781 Bhatinda - Rewari Passenger starts from Bathinda Jn (BTI) and ends at Rewari (RE). The full run is 300 km.
What time does train 54781 depart?
Train 54781 Bhatinda - Rewari Passenger is scheduled out of Bathinda Jn at 17:30, reaching Rewari at 01:15 on day 2. Actual departure can differ on the day, so check the live running status before you leave for the station.
How many stops does 54781 have?
Train 54781 has 37 scheduled halts between Bathinda Jn and Rewari, each listed with its arrival time, departure time and halt length. Stations the train passes without stopping are not counted.
Does train 54781 run daily?
Yes — train 54781 runs every day of the week.
How late is train 54781 running right now?
The live running status for train 54781shows its current delay in minutes along with the last station crossed. It is refreshed from the railways' own feed, so it reflects the position reported for the train at the moment the page is loaded.

Other trains from Bathinda Jn and Rewari

TrainRunningStatus.live is an independent service and is not affiliated with, endorsed by, or operated by Indian Railways or IRCTC. Timetable and running information is provided for guidance; always confirm critical timings with the railways.