57456 Train Running StatusMahbubnagar Secunderabad Passenger

57456

57456 Mahbubnagar Secunderabad Passenger route and time table

Scheduled arrival and departure at every halt, with the distance covered from Mahbubnagar. Times are as per the Indian Railways timetable — for today's actual running position, check the live running status for train 57456.

Station-by-station time table for train 57456 Mahbubnagar Secunderabad Passenger from Mahbubnagar to Kacheguda
#StationArrivesDepartsHaltDayDistance
2Diviti Palli (DTP)Source14:20110 km
3Jadcherla (JCL)14:2814:291 min118 km
4Gollapally (GLY)14:3714:381 min125 km
5Rajapur (RJAP)14:4314:441 min130 km
6Rangareddy Guda (RRGA)14:4914:501 min135 km
7Balanagar (BABR)14:5714:581 min141 km
8Burgula Halt (BRGL)15:0215:031 min144 km
9Shadnagar (SHNR)15:1315:141 min154 km
10Kottur (KOTT)15:2615:271 min167 km
11Timmapur (TMX)15:3115:321 min169 km
12Umdanagar (UR)15:4515:461 min185 km
13Budvel (BDVL)15:5415:551 min192 km
14Npa Shivarampalli Halt (NSVP)15:5916:001 min194 km
15Kacheguda Falaknuma (FM)16:0816:091 min199 km
16Huppuguda (HPG)16:1216:131 min1100 km
17Yakutpura Kacheguda (YKA)16:1616:171 min1102 km
18Kacheguda Dbr (DQR)16:1816:191 min1103 km
19Malakpet Kacheguda (MXT)16:2116:221 min1104 km
20Kacheguda (KCG)16:35Destination1106 km

About train 57456

Train number 57456 is the Mahbubnagar Secunderabad Passenger, run by Indian Railways between Mahbubnagar and Kacheguda, covering 106 km in about 2 hours 25 minutes with 19 scheduled halts. It runs every day of the week.

The train leaves Mahbubnagar at 14:20 and is scheduled to reach Kacheguda at 16:35 the same day. The whole journey is completed on the same calendar day.

Running status on this page is the live position reported for the train — which station it has passed, how many minutes it is behind schedule, and when it is now expected at each remaining halt. Delays build and shrink through a journey, so a train that is late early on can still recover time before it reaches you.

Frequently asked questions about train 57456

Where does train 57456 start and end?
57456 Mahbubnagar Secunderabad Passenger starts from Mahbubnagar (DTP) and ends at Kacheguda (KCG). The full run is 106 km.
What time does train 57456 depart?
Train 57456 Mahbubnagar Secunderabad Passenger is scheduled out of Mahbubnagar at 14:20, reaching Kacheguda at 16:35 the same day. Actual departure can differ on the day, so check the live running status before you leave for the station.
How many stops does 57456 have?
Train 57456 has 19 scheduled halts between Mahbubnagar and Kacheguda, each listed with its arrival time, departure time and halt length. Stations the train passes without stopping are not counted.
Does train 57456 run daily?
Yes — train 57456 runs every day of the week.
How late is train 57456 running right now?
The live running status for train 57456shows its current delay in minutes along with the last station crossed. It is refreshed from the railways' own feed, so it reflects the position reported for the train at the moment the page is loaded.

Other trains from Mahbubnagar and Kacheguda

TrainRunningStatus.live is an independent service and is not affiliated with, endorsed by, or operated by Indian Railways or IRCTC. Timetable and running information is provided for guidance; always confirm critical timings with the railways.